Home / Our Factory

Our Factory

4,000 m² in Fusha Town, Zhongshan — tooling, stamping and hardware production under one roof.

Founded in 2021, Zhongshan Haoyue Metal Technology Co., Ltd. produces door and window hardware in its own 4,000 m² factory in Fusha Town, Zhongshan — one of China's hardware manufacturing hubs. Around 40 people work in tooling, stamping and production.

What we can do for your project

  • In-house tooling — our own mold department keeps sampling fast and lead times short
  • Stamping on site — presses in our workshop, from prototype to mass production
  • OEM / ODM — your drawing, your brand, your packaging
  • Quality control — hinges salt-spray tested 72 hours
  • Stock and supply — one-stop service and stable supply for repeat orders
  • Export support — documentation and shipping terms handled by our export team

Production process

From drawing to shipment — 10 steps

One order runs through ten controlled steps in our own plant in Fusha Town. Here is what happens at each stage, with photos from the shop floor.

  1. 01

    Drawing & standard confirmed

    We start from your standard, not from a catalogue. Dimensions and tolerance, strip grade, thickness, surface finish, opening angle, damping and packing are written down and confirmed with you first, and only then do we issue the die drawing — how many stations, where blanking, forming and piercing happen, how the strip is fed, and what width and thickness it is cut to. This step closes with your written approval. The approved drawing and the approved first-article sample then become the reference for every inspection downstream, so “the same as the sample” becomes something we can measure rather than something we promise.

    Product drawing for a concealed hinge with dimensions and tolerances, confirmed with the customer before tooling
    Drawing and tolerance confirmed
    The same hinge drawing open in CAD while the die is being designed
    Die design in CAD
    The same hinge as a 3D model on screen — wall thickness, hole positions and barrel checked before the die is cut
    3D model check
  2. 02

    Tooling & die making — workshop 2

    Tooling steel and production strip are bought to the grade called out on the drawing, with the mill certificate kept on file. Every die we run is cut in workshop 2: the tooling shop on the ground floor, smaller than the press shop, with a retail counter on the street side of the plant.

    From the approved drawing our toolmakers cut the die in-house: die plates, pockets, slots and dowel holes on the CNC centres and vertical mills, cutting profiles on wire EDM held to micron clearance, deep ribs and sharp internal corners burned on the EDM sinker, then plates ground flat and parallel, assembled and fitted by hand. Punches and cutting edges are Daido DC53 — the improved grade, not the SKD11 most low-cost dies are cut from: 60–62 HRC after vacuum hardening and tempering, roughly twice the toughness, so edges resist chipping through long runs. Nothing leaves this workshop until the die closes cleanly on the bench.

    CNC machining centre cutting die plates, operator at the control screen
    CNC — die plates and pockets
    Medium-speed wire-cut EDM machine and its control cabinet
    Wire-cut EDM — the machine
    Wire, workpiece and dielectric inside the wire-cut EDM tank
    Wire-cut EDM — the cut
    Operator setting a die on the EDM sinker, control cabinet showing the burn path
    EDM sinker — burning the cavity
    Control cabinet of the EDM sinker with the burn path on screen
    EDM sinker — path on screen
    Surface grinder in the tool room, plates ground flat and parallel
    Surface grinder — plates flat and parallel
  3. 03

    Stamping

    Steel strip is sheared and fed to our presses — blanking, forming and piercing on multi-station dies, from pilot run to mass production.

    Operator loading a press
    Operator loading the press
    Presses running on the shop floor
    Presses running
    Shearing steel strip before forming
    Shearing the strip
  4. 04

    Surface cleaning — workshop 3

    Stamped parts are degreased and cleaned to take off stamping oil, metal dust and handling marks before any finishing operation. It looks like a small step and it decides a large result: oil left on the surface is exactly what turns into patchy plating, oil seepage and blotching on a cheap hinge a few months later — the finish has to key onto clean metal, not onto oil. Cleaned parts are dried straight away and moved into finishing, and the cleaning line and the parts are checked between batches rather than once a day.

    The line sits in workshop 3, on the fourth floor, in a shop of its own.

    The line runs five stages, in this order: vibratory grinding (deburring), media separation, multi-stage rinse, brightener dip, and dewatering and drying.

    Before and after surface cleaning: cleaned parts on the left, the same parts before cleaning on the right
    Cleaned (left) vs before cleaning (right)
    Vibratory grinding barrel deburring stamped hinge parts, first stage of the cleaning line
    01 Grinding — deburring
    Grinding media separated from hinge parts after vibratory finishing
    02 Media separation
    Multi-stage rinse tanks on the cleaning line, parts washed between stages
    03 Multi-stage rinse
    Hinge parts dipped in the brightener tank so the surface comes up to an even gloss
    04 Brightener dip
    Dewatering barrel and drying box at the end of the cleaning line
    05 Dewatering and drying
    Chain drive and sprocket running the cleaning line between the tanks
    The line running — chain drive
    Operator sorting cleaned hinge parts at the sorting bench
    Sorting at the bench
    Cleaned hinge parts crated and ready for assembly or packing
    Cleaned parts, crated and ready
  5. 05

    Polishing & brushing

    Polishing and hair-line brushing bring the surface to the finish agreed on the approved sample. Grinding and brushing follow a fixed grit sequence rather than whatever the operator reaches for, edges and burrs are taken off instead of being polished over, and the grain direction is kept consistent so the parts in a carton match each other and do not show a colour band under a shelf light. Parts are pulled during the run and compared side by side with the approved standard under the same light, which is how a drifting finish gets caught in the batch instead of at the customer.

    Hinge plates running under the brushing rolls of our polishing machine
    Polishing and brushing line
    Hair-line finish on the plate, grain direction held one way across the batch
    Hair-line finish
    Surface after polishing and brushing, silver and brass finish on the same component
    Surface check against the approved sample
  6. 06

    Plating & e-coating

    Where the finish calls for it, parts go to electroplating (GP / SC / AB / AC) or electrophoretic coating (EB). This is the one step we do not run inside our own walls: the parts go out to our plating plant and come back to us for acceptance, so the standard travels with the parts — sending it out is ordinary practice for a plant our size, and it changes the site of the work, not the specification. Coating thickness, colour and gloss are checked against the approved colour standard rather than judged by eye, finish adhesion is checked on a sample, and the coating is salt-spray tested to the specification — typically 72 hours — before a batch is accepted. Colour consistency is checked across the whole batch, not only on the first piece, because that is where a mix of light and dark pieces in one carton comes from.

  7. 07

    Assembly

    Barrel, pin, cams, springs and damping units are put together on our automatic assembly line: the stations sit along one conveyor, and the work that decides how a hinge feels — setting the pin, closing the barrel, fitting the damping unit — is done on pneumatic presses under a fixed setting rather than struck home by hand. That is what keeps the barrel round and the movement quiet, and it is the difference between a hinge that still closes smoothly after a long run of cycles and one that starts to drag. Assembled pieces are checked on the line as they come off, then move straight into testing.

    Assembly line with stations along the conveyor
    Assembly line — stations along the conveyor
    Pneumatic press setting the hinge pin
    Pneumatic press setting the pin
    Assembled hinges leaving the assembly line
    Assembled hinges leaving the line
  8. 08

    Packing

    Passed hinges are counted, bagged, cartoned and labelled to your specification — carton size and print, barcode, and shipping marks. Every carton carries its batch label, which is what keeps a shipment traceable back to the strip lot, the die and the inspection record, so the paperwork still works when the goods are already on a shelf in your warehouse. Count and marking are checked before cartons are sealed, cartons are stacked to hold their shape in a container, and mixed orders are packed against an agreed loading plan so the right references arrive together.

    Hinges counted and packed into an export carton at the packing station
    Cartoning
    Automatic packing machine on the packing line
    Automatic packing machine
    Carton sealing machine closing export cartons before labelling
    Carton sealing
  9. 09

    QC passed & warehoused

    Dimensional checks with calipers and gauges, function and load testing, then the batch is released to the warehouse.

    Dimensional checks with calipers and gauges
    Dimensional checks
    Passed parts crated for stock
    Parts crated for stock
    Passed parts binned and released to stock
    Released to stock
  10. 10

    Shipment

    Export packing, documentation and container loading are handled by our own export team — commercial invoice, packing list, and certificates such as CO or Form D where the destination calls for them. Loading is supervised rather than left to the driver, the container and seal numbers are recorded, and we send you photographs of the loaded container so you can see the goods leave the plant. Shipping documents are issued against the same batch records kept through production, so the batch you receive is the batch we tested.

Where it happens

Four workshops, one plant

Every step above has a named owner in Fusha Town: three workshops under our own roof, and one process we send out — which is normal for this trade. You still know exactly who handles what when something has to change.

Workshop 1 — presses, die repair, polishing, assembly

Ground floor, and the largest of the four. Stamping, die repair and modification, die setting, polishing and brushing, assembly and packing all run here, together with the warehouse and the QC bench. Shipment loads at the gate.

Workshop 2 — die making

Ground floor, smaller than the press shop, with a retail counter on the street side of the plant. CNC, wire-cut EDM, EDM sinker, surface grinding and hand fitting: every die we run is cut here.

Workshop 3 — surface cleaning

Fourth floor, a shop of its own. Cleaning only: vibratory grinding, media separation, multi-stage rinse, brightener dip, and dewatering and drying.

Workshop 4 — plating and electrophoresis

Plating and electrophoresis are finishes we supply as normal, not a gap in the range. The parts are sent out to our plating plant and accepted back here against the approved colour standard, with thickness, adhesion and salt spray checked to specification. Workshop 4 is the bay held for the day volume makes it worth running in-house. Outsourcing changes where the work happens, not what you receive.

Factory in photos

Inside the factory

Raw material, presses, tooling, testing and the site itself — walk through our workshop in Fusha Town. 18 photos, all as shot.

Press shop

Our hinge press shop in Fusha Town, Zhongshan: the main aisle with presses on both sides
Press shop — main aisle
Press line with blue parts stillages along the aisle
Press line and stillages
Operator loading strip into a 125-tonne press
Operator at the press

Dies & tooling

Die set fitted and clamped into the press bed for the trial run
Die fitted in the press
Die storage racks holding the tools we run for customers
Die store — racks
Aisle between the die racks in the tooling store
Die store — aisle

Raw material

Steel coils waiting in the plant before they go on the line
Steel coils in the plant
Coil mounted on the decoiler feeding the press line
Coil on the decoiler

Parts in production

Stamped hinge components in a blue crate straight off the press
Stamped parts after the press

Testing

Caliper check on a stamped component at the machine
Caliper check at the machine

Office & workshop

Hydraulic assembly machine.
Hydraulic assembly machine.

Our site

Factory gate in Fusha Town, Zhongshan, with the CJHYUE / Haoyue Metal sign
Factory gate, Fusha Town, Zhongshan
Aerial view of the hinge factory front elevation and loading yard, Fusha Town, Zhongshan
The plant from the air
Drone view of the main gate and loading yard of the hinge factory
Main gate and loading yard
Drone view of the whole hinge factory building and the neighbouring industrial blocks
Building and neighbouring blocks
Approach road and staff parking outside the hinge workshop
Approach road and parking

Night shift

Night shift on the press line — production still running under factory lighting
Night shift — press line running
Forklift moving parts between work centres during the night shift
Night shift — forklift transfer

Workshop video

The two loops below are cut from our 13-minute factory walk-through on YouTube — tooling shop, press line, testing laboratory and warehouse. Watch the full 13-minute factory tour on YouTube  ·  More videos on our YouTube channel.

Press shop at Haoyue Metal, Zhongshan
Press shop12-second loop from our workshop video. Watch the full 13-minute factory tour on YouTube.
Workshop walk-through at Haoyue Metal, Zhongshan
Workshop walk-through12-second loop from our workshop video. Watch the full 13-minute factory tour on YouTube.

Want to visit, or request samples?

We reply within 24 hours.

WhatsApp Us   Contact Us